Inquiry

AV Group

🪔 Shubh Deepawali
AV Pride — Luxury Residences, Nalasopara (W)
AV GROUP PRESENTS

AV PRIDE

Standing tall with 19 floors of architectural brilliance in Nalasopara (W). AV Pride redefines luxury living with a Swimming Pool, Multi-Purpose Turf, Amphitheatre and meticulously designed apartments that maximize every square foot.

Enquire Now  
AV Pride
Built By AV Group ✦ 19 Floors of Brilliance ✦ Elevate Your Living Standard ✦ Nalasopara (W) ✦ Premium Residences ✦ Welcome to AV Pride ✦ Built By AV Group ✦ 19 Floors of Brilliance ✦ Elevate Your Living Standard ✦ Nalasopara (W) ✦ Premium Residences ✦ Welcome to AV Pride ✦
AV Pride
Under Construction

19 Floors · Nalasopara (W)

AV Pride

A tower of pride — 19 floors of architectural brilliance in Nalasopara (W). Each apartment is meticulously designed to offer the best possible utilization of every single square foot, with world-class amenities that elevate your living standard.

Investment ₹36 – ₹55 LAKH*
Completion MARCH 2027
Plan CLP / ONE TIME
Apartments 150+ UNITS
BHK Units 1 BHK & 2 BHK
Location NALASOPARA (W)
World Class Facilities

Refined Lifestyle

Surveillance System

24×7 Security

Fire Safety

Swimming Pool

Kids Play Area

Landscape Garden

AC Community Hall

Fitness Centre

Multi-Purpose Turf

Amphitheatre

Covered Parking

Power Backup

Strategic Location

Connected to Everything.

AV Pride is located Opp. Rahul International School, Virar-Nallasopara Link Road, Nallasopara (W) — 401203. A prime address with seamless connectivity.

Beach

9 km

DMart

2 km

Bus Stop

0.2 km

Hospital

0.35 km

Park

0.4 km

Railway Station

2 km

School

0.01 km

Bank

0.5 km

Get In Touch

Sahi email format likhein (e.g. Example@gmail.com)
IN +91
Sirf number likhein (0-9)

"Your vision is our blueprint. Let's create something extraordinary together."

Our Presence
Virar East, Mumbai, Maharashtra
Direct Line
Email Us
WhatsApp Support
AV Group
AV Group
AV Group Assistant ✨
Online
×